| 1. install vapor barrier (0.2 mm PE film) and underlay |
2. lay panels close together on floor |
3. lock in half-length panel with rotating motion |
 |
 |
 |
| 4. observe clearances |
5. dock in panel lengthwise |
6. link panels transversely |
 |
 |
 |
| 7. continue in stepped fashion |
8. Rotate offcut section through 180กใ
and mark accordingly |
9. shorten last panel, rotate through 180กใ and slot in |
 |
 |
 |
| 10. fit panel using drawbar |
11.start the next row with the leftover
section (min.40cm) |
12. cut last row to size |
 |
 |
 |
| 13. allow for expansion |
14. ensure floor is able to "float" |
15. expansion joints |
 |
|
|
| 16. Done! |
|
|